Module 0: HPE Synergy Administration Course Overview:
	• Introduce composable infrastructure (basic concepts) and HPE Synergy domains
	• Explore the functional architecture of the HPE Synergy environment:
	– Management infrastructure (HPE Synergy Composer and Frame Link Modules)
	– Compute modules
	– Interconnect modules
	– Local storage systems
	– Power and cooling
	• Review the HPE Synergy portfolio and equipment capabilities
	• Explain the basics of the HPE Synergy master/ satellite interconnects topology and cabling
	 
	Module 1: HPE Synergy Solution:
	• Solution overview
	– Planning steps
	– Configuration steps
	• Hardware overview
	• Management appliances
	• Frame management cabling
	• Power cabling
	• Interconnect link topology
	• Accessing HPE Synergy Composer
	 
	Module 2: HPE Synergy Cabling: 
	• Ethernet modules
	• Interconnect link topology
	• Ethernet traffic flow
	 
	Module 3: HPE Synergy Networking:
	• Network connectivity settings
	• Address identifier service
	• Network, network sets
	• Logical interconnect groups
	• Enclosure groups
	• Logical enclosure
	• Interconnect settings, LACP load balancing
	 
	Module 4: HPE Synergy Storage:
	• SAN configuration
	• Storage management
	• SAN Manager
	• Networks
	• Zoning
	• Fabric
	• Composable arrays
	• Volumes and volume templates
	• Storage options
	– Storage array
	– HPE Synergy D3940 Storage Module
	 
	Module 5: HPE Synergy Composability:
	• Server hardware
	– HPE Synergy Gen10 Compute, HPE Integrated Lights Out 5
	• Server hardware types
	• Server profile template
	• Server profile
	• Physical addressing
	• Compliance
	 
	Module 6: HPE Synergy Firmware:
	• Current HPE OneView Updates
	• Acquiring firmware
	• Interconnect firmware updates
	• Compute firmware
	• OS tools
	• Appliance firmware
	• Upgrading hardware
	• Preparing to upgrade
	• Best practices
	• Tools
	• Compliance
	• References
	 
	Module 7: HPE Synergy Scaling: 
	• Scaling frames in HPE Synergy
	• Adding a remote management ring
	• Frictionless scaling of a logical enclosure
	– The procedure for scaling from one to two frames
	– The procedure for scaling from two to more frames
	– Scaling with 25/50 Gb interconnect link modules
	 
	Module 8: HPE Synergy Maintenance and Growth: 
	• Maintenance topics
	• Remote management ring
	• Adding frames
	• Composer upgrades
	• Composer migration
	• Flm move to 4 port
	• Changing Ethernet fabric
	• New LIG|EG, reparent LE